A Pictorial History Of The Great TherapyTub and Laundry Room Project
When I moved to this abode, there was a 6 person HotTub sunken to floor level. I brought it above floor for technical reasons, and then decided to just take it completely out of the spa room. There was no door where the newly set door is today, and before the door was framed, the HotTub was taken out through the 32" gap between every other stud.
And so the immediate procedure is to do the "PipeFitter's" work, and make sure that all the fitting, and pipe joints, valves, Ts, Ys, and like that fit and are where they should be according to the concept.
The following photos show the progress of that project.
The progress will be updated as the work continues.